Keystone Retaining Walls NZ: How Segmental Block Works

Keystone-style segmental block retaining walls in NZ: how they hold, when geogrid is needed, base and drainage, prices and where they suit or do not.

In short

  • Keystone-style walls are dry-stacked interlocking concrete blocks, built with no mortar.
  • Low walls work by weight. Taller walls are tied back with geogrid.
  • They need room behind the wall, which many hill sections lack.
  • Guide price in Wellington: $550 to $950 per m², built.

In New Zealand "Keystone" has become the everyday name for segmental retaining walls: split-face concrete blocks stacked dry, with no mortar and no steel through them. They are a familiar sight on subdivisions, driveway edges and commercial sites. This guide explains how the system holds soil back, what it needs to work and when another wall type is the better choice.

How a segmental block wall works

Each block is a heavy, hollow or solid concrete unit with a way of locking to the course below, usually fibreglass pins or a moulded lip. The lock also sets each course back a little from the one beneath, so the finished wall leans into the bank. Hollow cores and the space directly behind the blocks are filled with drainage aggregate.

There are two modes.

  • Gravity wall. Up to a certain height, the weight of the blocks and their setback is enough to resist the soil. For standard residential blocks on firm level ground with no load above, that is commonly somewhere around a metre. The supplier's tables give the exact limit for each block.
  • Reinforced soil wall. Above that, sheets of geogrid, a strong plastic mesh, are laid between courses and run back into the fill behind, typically for a distance of 60 to 100 percent of the wall height. The fill is compacted over each layer. The blocks, grid and fill then act together as one thick mass.

What it stands on

There is no concrete footing in most designs. The first course sits on a levelling pad of compacted base course in a trench, with part of the bottom block buried. The pad has to be on firm natural ground. Getting the first course dead level is the slowest and most important part of the job, because every course above copies it.

Drainage

A column of clean drainage aggregate, 300 mm or wider, goes behind the blocks, with a drain coil at the base running to an outlet and filter fabric against the soil. Because the joints are open, a segmental wall does not need weep holes. See the drainage guide.

Where segmental block suits

  • Curves. The blocks are tapered, so the wall can sweep around a garden or driveway without cutting.
  • Finished look. The split face needs no plaster or paint and matching cap units finish the top.
  • Fill situations. Where ground is being built up behind the wall anyway, as on a new subdivision, laying geogrid in the fill is easy.
  • Terraces and garden walls around a metre high.
  • Moderate ground movement. With no mortar to crack, the wall can settle slightly without visible damage.

Where it does not suit

  • Tight boundaries. Geogrid for a 2 metre wall may need to run 1.5 to 2 metres back. If that space belongs to the neighbour or is under a building, it cannot be used.
  • Cut faces in rock. Where a bank of weathered greywacke is being held, excavating a further 2 metres behind it for geogrid makes little sense. A cantilever wall is more efficient.
  • Hard-access sites. Blocks arrive on pallets weighing around a tonne and each block is 20 to 40 kg. Add the base course, drainage aggregate and compactable fill, and there is a lot to carry.
  • Right against a house, where a thin reinforced block wall with waterproofing is the usual answer.

This is why segmental walls are common in newer drive-on suburbs such as Churton Park, Aotea and Riverstone Terraces and less so on the older steps-only streets of the inner city.

Engineering and consent

The national rule is the same as for any wall: no building consent up to 1.5 metres of retained ground with no surcharge. Within that, a builder can follow the block supplier's published design tables. Beyond it, an engineer designs the wall, specifying the geogrid type, length and spacing, the fill and the compaction, and the wall needs a consent. In Wellington the design allows for earthquake load, which generally means longer or closer geogrid layers. The regulations guide has the full picture.

Cost

Guide price in Wellington is $550 to $950 per square metre of face, built, including base, drainage and capping. A curved garden wall 8 metres long and 0.9 metres high is 7.2 m², so $3,960 to $6,840. A 15 metre driveway wall 1.8 metres high is 27 m², or $14,850 to $25,650, plus engineering at $2,000 to $5,000 and consent fees of $2,500 to $6,500. Geogrid walls also need imported fill if the site soil is clay that will not compact well.

Common mistakes

  • Base on soft ground or topsoil. The wall settles unevenly and the courses open up.
  • No geogrid, or grid cut short. The wall bulges at mid height within a few years.
  • Clay backfill. Geogrid needs granular, compacted fill to grip.
  • Downpipes or surface water discharging behind the wall.
  • Building higher later. Adding courses to a gravity wall takes it past its design height.

Segmental block compared with the alternatives

Segmental blockConcrete sleeperReinforced block
Guide price per m²$550 to $950$600 to $1,050$650 to $1,100
Room needed behindMostLeastLittle
CurvesEasyAngles onlyPossible
Concrete pour neededNoPost holesFooting and cores
Carried in by handHardFeasibleHard

For help choosing, see the wall types guide or the concrete walls page. To have a site looked at, call 04 887 1262.

Questions people ask

How high can a Keystone wall be without geogrid?

It depends on the block, the soil and what is above the wall. For standard residential blocks on firm level ground with no surcharge it is commonly about a metre. Check the supplier's tables for the specific block.

Do Keystone walls need a concrete footing?

Usually not. They sit on a compacted base course pad on firm ground. Some engineered designs call for a concrete levelling pad.

Do Keystone blocks need mortar or glue?

No mortar. The blocks lock by pins or lips. Cap units are normally fixed with a construction adhesive.

How long do segmental block walls last?

The concrete blocks and plastic geogrid are both expected to last 50 years or more. Failures are nearly always from a poor base, missing geogrid or bad drainage, not from the materials wearing out.

Need a firm price for your own wall?

Tell us where the wall is and roughly how big. We line up a site visit, and the builder follows it with a written price broken into its parts. Or phone and talk it through.

Call 04 887 1262

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote