Retaining Walls Wellington

Timber, concrete, stone and gabion retaining walls for Wellington hill sections. Planned around steep ground, long wet spells and earthquakes, including the sites where everything goes in by hand.

  • Timber, block, concrete sleeper, stone, gabion and crib walls
  • Old walls and small slips assessed, repaired or rebuilt
  • Engineer and council consent organised when required

Get a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Timber post and rail retaining wall beside paving
Stacked rock retaining wall on a bank
Gabion basket wall with steps
Concrete sleeper retaining wall with a fence above
Walls for Wellington

Steep sections, wet winters, shaky ground.

Half the houses in this city sit above or below the street on a cut bench, and something is holding each of those cuts up. Under the topsoil is weathered greywacke: firm when dry, crumbly and slick after three weeks of rain. Add a fault line under the harbour and it is clear why a Wellington wall needs more thought than a garden edge.

So the site visit starts with the hill, not the catalogue. The builder checks what the wall will be founded in, where runoff comes from and where it can go, what sits above the wall, and how timber, steel and concrete will get to it. Then you get a price in writing with each of those parts shown.

How this works →
Segmental concrete block retaining wall
Prices

What a retaining wall costs in Wellington.

Built ranges for each square metre of wall face, drainage included, on a site a small digger can get to. A wall 8 metres long and 1.2 metres high has 9.6 square metres of face.

WallGuide price
Timber pole and rail, 1.5 m or lower$400 to $700 per m²
Engineered timber, taller than 1.5 m$700 to $1,100 per m²
Segmental (Keystone-style) block$550 to $950 per m²
Concrete sleepers in steel posts$600 to $1,050 per m²
Reinforced masonry block$650 to $1,100 per m²
Gabion baskets$450 to $850 per m²
Timber or concrete crib$600 to $1,000 per m²
Stacked rock$400 to $800 per m²
Mortared stone$800 to $1,500 per m²
Demolishing an old wall$100 to $250 per lineal metre

Guide ranges only. Steps-only and hand-carry sites add about 20 to 50 percent. Walls above 1.5 metres, or holding up a parking pad or building, need an engineer and a building consent as well.

Read the price guide →

How it works

From enquiry to finished wall.

  1. Describe the wall

    By form or by phone. A rough length and height, the suburb, and whether the wall is reached by drive, path or steps.

  2. Builder on site

    They measure up, dig a test hole if needed, look at the slope above and below, and plan the route for materials and the drain outlet.

  3. Price on paper

    One line each for the wall, drainage, engineering, demolition and access, plus an expected start date.

  4. Build, then walk the wall

    A single crew takes it from first hole to final backfill. You inspect the finished wall with the builder before the last payment.

Before you compare prices

Four things to ask every builder.

Two prices for one wall can sit thousands of dollars apart. These four lines explain most of the gap, so get each of them in writing.

01

Founding

How deep the poles or footing go, and whether that reaches firm ground and not old fill tipped over the bank.

02

Drainage

Drain coil, drainage metal and fabric behind the wall, and exactly where the outlet will discharge.

03

Access and spoil

How materials get in and how the dug-out soil gets off the section. On steps-only sites this is a big share of the price.

04

Engineering

Whether a design and consent are included. Over 1.5 metres, or with a load or a steep slope above, they are required.

Where we work

Retaining wall builders across the region.

Wellington City, the Hutt Valley, Porirua and the Kāpiti Coast. Ground, access and council change from one place to the next, so each area has a page of its own.

Every area →
Consents

Will your wall need a consent?

The Building Act lets you build a retaining wall without a building consent if it holds back 1.5 metres of ground or less and nothing else bears on it. On a hillside that second condition does a lot of work. A parking pad, a house, or ground that carries on rising behind the wall all count as load.

District plan rules sit on top of that and differ between Wellington City, the Hutt, Upper Hutt, Porirua and Kāpiti. If your wall needs an engineer, a building consent or a resource consent, the builder organises it as part of the job.

Retaining wall rules explained →

Materials

Timber, concrete, stone or gabion?

Timber is cheapest and can be carried anywhere. Concrete sleepers and block cost more, carry more and last far longer. Stone is for walls you want to look at. Gabions and cribs suit banks that weep water.

Height, load, room to dig and access usually narrow it to one or two sensible options before taste comes into it.

Materials for a Wellington wall →

Questions

What people ask before they call.

How much does a retaining wall cost in Wellington?

For a wall a small digger can reach, treated timber up to 1.5 metres is about $400 to $700 per square metre of face, built and drained. Concrete sleepers run $600 to $1,050, reinforced block $650 to $1,100, gabions $450 to $850 and mortared stone $800 to $1,500. Steps-only sites where materials are carried in cost roughly 20 to 50 percent more.

Do I need a building consent for a retaining wall in Wellington?

Only some walls are exempt: those retaining up to 1.5 metres with no additional load. A car park, a building or a slope that keeps rising above the wall all count as load, so many hillside walls need a consent and an engineer even when they are low. District plan rules are separate and vary by council.

Which council do I deal with?

It depends where the property is: Wellington City Council, Hutt City Council, Upper Hutt City Council, Porirua City Council or Kāpiti Coast District Council. Each runs its own building consents and district plan. Work near streams can involve Greater Wellington Regional Council too.

Can a wall be built on a section with no vehicle access?

Yes. A lot of Wellington walls are dug by hand, with poles, sleepers and bagged concrete carried up or down steps. Expect more days on site and a higher price than a drive-in job, and expect the builder to suggest timber or concrete sleepers.

What makes retaining walls fail here?

Water first. Weeks of rain soak the slope and load the back of any wall without drainage. After that come posts founded in loose fill instead of firm ground, timber that was never treated for burial, and earthquake shaking finishing off a wall that was already tired.

Who does the building?

Retaining Walls Wellington NZ is an enquiry service. We pass your details to an independent Wellington retaining wall builder we partner with. They visit, price and build under their own name, and your contract is with them.

What areas are covered?

Wellington City from Miramar and Island Bay to Karori, Johnsonville and Tawa, plus Lower Hutt, Upper Hutt, Porirua and the Kāpiti Coast.

What happens at the site visit?

The wall line gets measured, the ground above and below gets checked, and the builder works out how gear and materials will reach it and where the drain can empty. A written price follows, with the wall, drainage, engineering and any demolition shown as separate lines.

Want a price on your wall?

Tell us where the wall is and roughly how big. We line up a site visit, and the builder follows it with a written price broken into its parts. Or phone and talk it through.

Call 04 887 1262

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote