Home › Timber retaining walls

Timber Retaining Walls in Wellington

Treated pole and rail walls for cut banks, paths, parking pads and gardens. Light enough to carry up the steps, which is why Wellington hillsides are full of them.

  • Site visit and a written price that lists each cost
  • H5 poles set in concrete, H4 rails, drain coil behind
  • Engineer and consent organised where the wall needs them

Get a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Timber is the working wall of the Wellington hills. Poles, rails and bags of concrete can all go up a zigzag path on a shoulder or a barrow, so a timber wall can be built where a concrete truck or a pallet of blocks will never reach. It is also the cheapest wall per square metre.

What decides whether it lasts is below the ground and behind the rails: how deep the poles sit in the weathered rock, what treatment the timber has, and whether the water coming down the hill has a way out.

Timber retaining wall held in steel posts with a handrail above
Illustrative photo

How the builder puts one up

  1. Mark out and cut the bank. The line is strung and the face trimmed back far enough to leave room for drainage behind the rails.
  2. Dig the pole holes. A small digger with an auger does this where it can get in. On steps-only sections the holes are dug by hand with a spade and bar, usually 1.0 to 1.2 metres apart.
  3. Stand the poles. H5 treated poles go in and are concreted. The working rule is as much pole below ground as wall above it, and more on a slope. On taller walls the engineer sets the depth.
  4. Fix the rails. H4 rails go on from the bottom up, on the uphill side of the poles so the ground pushes them onto the poles.
  5. Drain and backfill. Drain coil at the base, drainage metal up the back, filter fabric against the soil, and an outlet taken to a proper discharge point.

Pole sizes, spacing and depth are covered in the timber wall design guide.

Where timber is the right call

  • Good for: cut banks behind the house, garden terraces, path and step edges, and most walls to about 2 metres where the look of timber suits.
  • Less suitable: right against a house wall, under a parking pad that carries cars every day, or anywhere a rebuild in 30 years would be very hard to reach. There a concrete sleeper or block wall earns its extra cost.
  • By the sea: in Island Bay, Lyall Bay, Seatoun or Eastbourne, salt eats ordinary galvanised bolts. Ask for stainless fixings.

Life of a timber wall

With the right treatment and working drainage, 20 to 40 years is a fair expectation. Walls that fail sooner usually have fence-grade timber in the ground, rails buried in wet clay with no drainage metal, or poles that stop in loose fill instead of reaching firm ground. If yours is leaning or soft at the base, read about repairs and replacement.

Timber retaining wall prices in Wellington

ItemGuide price
Pole and rail wall, 1.5 m or lower$400 to $700 per m²
Engineered timber wall, taller than 1.5 m$700 to $1,100 per m²
Engineer's design, where required$2,000 to $5,000
Taking out an old wall$100 to $250 per lineal metre
Steps-only or hand-carry siteadd about 20 to 50 percent

Indicative ranges covering labour and materials. Treat the written price from the builder as the real number.

Questions on timber retaining walls

What does a timber retaining wall cost in Wellington?

Roughly $400 to $700 for each square metre of wall face on walls up to 1.5 metres, built and drained, where a small digger can reach. Engineered walls above that height run $700 to $1,100. If everything has to be carried in by hand, allow about 20 to 50 percent more.

Will my wall need a building consent?

A wall is exempt only when it holds back 1.5 metres of ground or less and nothing else loads it. A parking pad, a house, or a hillside that keeps climbing behind the wall all count as extra load, and on Wellington slopes that catches plenty of low walls. Those need an engineer and a consent. Check your own property with your council.

Which timber treatment is correct?

H5 for any pole or post standing in the ground. H4 for rails and anything else in contact with soil. H3 timber is for decks and fences and does not last buried.

Can a timber wall be built with no machine access?

Yes, and in Wellington it often is. Holes are dug by hand, poles and rails are carried in, and concrete is mixed on site or pumped through a hose. It takes more labour, so it costs more, but it is routine work here.

How long is the builder on site?

A wall of 10 to 15 metres with digger access is commonly finished inside a week. Hand-dug jobs, rock in the holes and southerly weather stretch that. Consented walls need design and council time before the first hole.

Who turns up to build it?

An independent Wellington retaining wall builder that we partner with. They come to the site, write the price and do the job under their own name. This website takes the enquiry and sets up the visit.

How it works

How a job runs.

  1. Describe the wall

    By form or by phone. A rough length and height, the suburb, and whether the wall is reached by drive, path or steps.

  2. Builder on site

    They measure up, dig a test hole if needed, look at the slope above and below, and plan the route for materials and the drain outlet.

  3. Price on paper

    One line each for the wall, drainage, engineering, demolition and access, plus an expected start date.

  4. Build, then walk the wall

    A single crew takes it from first hole to final backfill. You inspect the finished wall with the builder before the last payment.

Price up your timber walls

Tell us where the wall is and roughly how big. We line up a site visit, and the builder follows it with a written price broken into its parts. Or phone and talk it through.

Call 04 887 1262

Request a free quote

Tell us about the job. We reply within one working day.

Free site visit and written quote · No obligation

Call nowFree quote