In short
- Poles do the work. Their depth in firm ground matters more than their size above it.
- Rule of thumb: as much pole below ground as wall above, more on a slope.
- H5 poles, H4 rails, hot-dip galvanised or stainless fixings.
- Over 1.5 m or with surcharge, an engineer sets every dimension.
A timber pole wall is a row of vertical cantilevers. Each pole is held by the ground it is buried in, and the rails span between poles to hold the soil. Get the poles right and the rest is carpentry. This guide sets out the usual New Zealand practice for walls within the consent exemption and explains what changes once an engineer is involved. The numbers are rules of thumb, not a design.
Poles
Round or square
Round poles, sold by small end diameter (SED), are the traditional choice and good value. Square posts, typically 125 or 150 mm, give a tidier face and are easier to fix rails to. Both must be H5 treated. For a wall around a metre high, round poles of 150 to 175 mm SED are common. Nearer 1.5 metres, 200 mm and above.
Spacing
Usually 1.0 to 1.2 metres between centres. Closer spacing shares the load across more poles and lets lighter rails be used. Wider spacing saves holes and puts more on each pole and rail.
Embedment
The working rule is to bury as much pole as stands above ground: a 1.2 metre wall gets poles at least 1.2 metres into the ground, so each pole is 2.4 metres or longer. Increase that when:
- the ground in front of the wall slopes away, because there is less soil to push against;
- the hole passes through fill, topsoil or soft clay before reaching firm ground;
- there is any slope or load behind the wall.
Depth is measured into competent ground. A metre of loose fill over rock counts for very little.
Holes and concrete
Holes are drilled 400 to 600 mm across, wide enough for at least 100 mm of concrete all round the pole. The pole is stood on a little concrete or gravel so its end is not sitting in a pool of water, braced plumb or with a slight lean into the bank, and the hole is filled with concrete. A lean of about 1 in 10 back toward the retained soil looks right and allows for a little movement as the wall takes up load.
Rails
Rails are the horizontal boards that hold the soil. Common choices are 150 x 50 mm rough-sawn or tongue-and-groove retaining timber for low walls, and 200 x 75 or 200 x 100 mm for taller walls or wider pole spacing. All H4.
Rails go on the uphill side of the poles wherever possible. The soil then presses the rails against the poles and the fixings only locate them. Rails fixed to the front face rely entirely on the nails or bolts, so they need heavier fixings and more of them. Leave small gaps between rails, or use boards that do not seal tight, so water is never trapped.
Fixings
Hot-dip galvanised nails, coach screws or bolts are the minimum. Treated timber is corrosive to plain steel, and electroplated fixings do not last. Within reach of salt spray, which in Wellington covers the south coast, the harbour bays and much of Porirua and Kāpiti, use stainless steel.
Drainage
A timber wall leaks a little through its joints, which helps, but it still needs proper drainage: a perforated drain coil at the base of the excavation laid to a fall, at least 300 mm of drainage metal up the back of the rails, and filter fabric between the metal and the natural ground. The coil needs an outlet to stormwater or another approved point. More in the drainage guide.
Sizes at a glance
| Wall height | Typical pole | Typical embedment | Typical rail |
|---|---|---|---|
| Up to 0.6 m | 125 mm square or 125 SED | 0.6 m or more | 150 x 50 |
| 0.6 to 1.0 m | 150 to 175 SED | 1.0 m or more | 150 x 50 or 200 x 50 |
| 1.0 to 1.5 m | 175 to 225 SED | 1.5 m or more | 200 x 75 |
| Over 1.5 m | Engineer designed | Engineer designed | Engineer designed |
Typical practice on level, firm ground with no surcharge. Not a substitute for a design. Slopes, fill and loads all increase these.
When timber walls go wrong
- Poles too short. The wall rotates forward from the base within a few winters.
- Wrong treatment. H3 or H4 poles rot at ground level, where air, moisture and soil meet.
- Cut ends untreated. Saw cuts expose less-treated wood. They should be sealed with a preservative and kept out of the ground.
- Backfilled with clay. The excavated soil is shovelled straight back and no drainage metal is used.
- Loaded later. A garden wall ends up beside a new parking pad.
Engineered timber walls
Above 1.5 metres, or with a surcharge, the engineer specifies pole diameter, spacing, depth and concrete, and may add steel. Tall timber walls often use poles of 250 to 300 mm, holes 2.5 to 3 metres deep, and sometimes tie-backs or a second row of anchors. In Wellington the design also allows for earthquake load. Costs move from $400 to $700 to $700 to $1,100 per square metre, plus $2,000 to $5,000 for the design. For example, a 10 metre wall 2 metres high is 20 m², or $14,000 to $22,000 before engineering and consent.
Is timber the right choice?
Timber is light, forgiving and the cheapest wall to build, which is why it dominates on steep sections with poor access. It is not the best choice against a house, under daily vehicle load or where replacement in 30 years would be very disruptive. The sleeper guide and the types guide cover the alternatives. For timber walls built in the region, see timber retaining walls in Wellington.
Questions people ask
How deep should retaining wall posts be?
As a rule of thumb, at least as deep as the wall is high, measured into firm ground, and deeper on slopes or in fill. For walls over 1.5 metres or with any surcharge, the engineer sets the depth.
Can I use H4 posts in a retaining wall?
Not for the poles. H4 is for timber in ground contact in less critical uses, such as rails and garden edging. Structural poles buried in the ground should be H5.
Should rails go in front of or behind the posts?
Behind, on the soil side, wherever the layout allows. The ground then pushes the rails onto the posts instead of pulling on the fixings.
How far apart should posts be?
Usually 1.0 to 1.2 metres centre to centre for walls up to 1.5 metres. Engineered walls may differ.